Bampfylde Way

Client: 
Galliford Try
Duration: 
20 Months
Location: 
Plymouth
System Supplier: 
SPSEnvirowall

C&P Plastering carried out the installation of an SPS Envirowall Rendaclad System on an additional 95 timber frame units for the second phase of the Southway scheme. 

Similar to Skerries Road (Phase 1), Insulated Brickrend has been used on the plinths with the properties being cladded using Supertech boards.

The former primary school site now consists of a range of 95 1-, 2-, 3- and 4-bed homes with easy access to local shops and school.